PRODUCTS

Products

Browse product categories
18.5-inch Slim Narrow-Bezel Android Touch Computer

18.5-inch Slim Narrow-Bezel Android Touch Computer

An 18.5-inch slim touch all-in-one computer with a narrow-bezel enclosure. This enclosure is also listed in 15.6-inch and 21.5-inch versions.

Enquire about this product

18.5-inch Slim Narrow-Bezel Android Touch Computer

An 18.5-inch slim touch all-in-one computer with a narrow-bezel enclosure. This enclosure is also listed in 15.6-inch and 21.5-inch versions.

Touch display and integration

The series provides capacitive multi-touch and wired or wireless connectivity options. Confirm the screen, mounting arrangement, computing board and peripheral interfaces for your installation.

Configuration for your application

Operating systems, wireless modules, identification modules and AI expansion are configuration choices. They are not all included in every unit. Contact us with your required screen size, software environment, interfaces and deployment region so the supplied configuration can be confirmed.

Product views

18.5-inch Slim Narrow-Bezel Android Touch Computer — product view 1

18.5-inch Slim Narrow-Bezel Android Touch Computer — product view 2

18.5-inch Slim Narrow-Bezel Android Touch Computer — product view 3

18.5-inch Slim Narrow-Bezel Android Touch Computer — product view 4

18.5-inch Slim Narrow-Bezel Android Touch Computer — product view 5

18.5-inch Slim Narrow-Bezel Android Touch Computer — product view 6

18.5-inch Slim Narrow-Bezel Android Touch Computer — product view 7

18.5-inch Slim Narrow-Bezel Android Touch Computer — product view 8