We manufacture the panels, edge devices and terminals — and build the software that runs on them. One supplier for hardware, digital factory systems and public infrastructure.
We manufacture the panels, edge devices and terminals — and build the software that runs on them. One supplier for hardware, digital factory systems and public infrastructure.
ESOP, light MES, Andon and maintenance software running on hardware we build ourselves — integrated with the ERP you already operate.
Digital wayfinding, environmental sensing and park platforms — delivered with named integration partners, on hardware we manufacture.
IP65 stainless panel PCs, box PCs and rugged displays from 7 to 32 inches — Windows or Linux, assembled and burn-in tested in our own plant.
ESOP replaces printed work instructions with a live terminal at every station — revision-controlled, photo-rich and readable at arm’s length.
Light MES tracks orders, WIP and yield line by line, then pushes the numbers to the dashboards supervisors actually watch.
Andon call points, stack lights and mobile maintenance tickets close the loop between the operator’s hand and the technician who fixes it.
Camera stations and edge inference check dimensions, labels and surface defects at line speed, writing results straight into the MES record.
Configured, tested and packed in our own facility, then supported by regional partners with spares held locally.
Our own SMT line, ESD assembly benches and burn-in racks mean a spec change takes weeks, not quarters.
Hardware, factory software and public infrastructure are sold separately — but designed, manufactured and supported by the same group. That is why a spec change takes weeks, not quarters.
Business 01
Panel PCs, box computers and edge AI devices built for 24/7 duty — shipped with the drawings, certificates and lead times your procurement team needs.
Business 02
ESOP, light MES, Andon and maintenance software running on hardware we manufacture — sold and commissioned as one system, not three projects.
Business 03
Platform software, industrial terminals and data capture for parks, transit and utilities — delivered with named integration partners, with scope written down.
Business line, product category, model. Every SKU on this site sits in exactly one place — and every product page ends with a downloadable datasheet.
Intelligent terminals, industrial computers and hardware for production environments.
Paperless work instructions, visual management and shop-floor systems that connect plans to execution.
ESOP Paperless Work Instructions
KECHUANG ZHIYUAN ESOP delivers electronic work instructi···
→
Intelligent Kanban System
KECHUANG ZHIYUAN intelligent Kanban dashboards bring pro···
→
Andon Call System
The Andon call and alert system helps production teams i···
→
ESD static monitoring
KECHUANG ZHIYUAN ESD monitoring helps electronics manufa···
→
TPL Pick-to-Light System
The TPL Pick-to-Light system uses illuminated electronic···
→
Lightweight MES
A manufacturing execution system (MES) connects producti···
→
Quality Traceability System
KECHUANG ZHIYUAN quality traceability links product and ···
→
Injection Moulding and CNC Data Acquisition
KECHUANG ZHIYUAN machine data acquisition brings informa···
→
Inspection and Equipment Maintenance
KECHUANG ZHIYUAN inspection and equipment maintenance ma···
→
Flagship AI-ESOP
→
Power Bank MES and Quality Traceability
→
Equipment Maintenance Management
→
Equipment and Production Data Acquisition
→
Reliable industrial terminals and computing equipment for digital applications.
Fanless industrial computers with wide temperature and voltage range, multiple serial and network ports for production lines and cabinets.
Learn more →Six entry points. Each one lists the typical constraint, the product combination that answers it, and a reference installation you can visit.
Specifications, test reports and certificates are published per model — not summarised in a brochure. If a number appears on this site, there is a PDF behind it.
Our panels ship with the certificate set required at the point of installation — not a generic declaration of conformity issued for a different model.
| Operating temperature | −20 °C to 60 °C |
|---|---|
| Ingress protection | IP65 front · IP69K option |
| Vibration | 1.5 g RMS, 10–500 Hz |
| MTBF | > 50,000 h |
| OS support | Windows 10/11 IoT · Linux · Android |
| Mounting | Panel · VESA 75/100 · Arm |
Most integrators resell someone else's panel and someone else's software. We do the electronics, the firmware, the factory software and the on-site commissioning ourselves.
How we workBoards, enclosures and thermal design done in Suzhou — so a spec change takes weeks, not quarters.
Signed OTA updates, documented APIs and no hidden cloud dependency. Your line keeps running when the WAN drops.
Work orders, call events and OEE share one schema, so reports reconcile without a data-warehouse project.
Our engineers commission on site and train your team. 48-hour response across 120+ countries.
Three regions, one product nomenclature. Regional pages carry local voltage, certification and lead time — so a part number means the same thing in Rotterdam and Monterrey.
Rotterdam · Dubai · Warsaw
Suzhou · Singapore · Yokohama
Monterrey · Chicago
You should not have to fill in the same form four times. Each route below goes to a different team with the context they actually need.
Send a spec or a drawing. Priced within two business days.
Start an RFQBook 30 minutes with an application engineer.
Book a callFull specs, 2D/3D drawings and certificates per model.
Get the PDFDistributor and system-integrator programme.
ApplyDiscover how digital solutions create value in real projects.
Using Guangdong, a hypothetical medical device manufacturer in Guangdong, this article examines ···
View case
This case uses a hypothetical Ningbo-based medical IoT device manufacturer with a Guangdong prod···
View case
This case uses an anonymous medical electronic equipment manufacturer as the hypothetical reader···
View case
This article uses Fortune, a hypothetical East China urban infrastructure investment and operati···
View case
Using a hypothetical municipal city infrastructure investment and operations group in East China···
View caseThe latest in intelligent manufacturing, industrial IoT and digital transformation.
Send a photo of the station and the ambient conditions. We will come back with a mounting plan, a BOM and a lead time — usually within two working days.