Browse product categories

50-inch Android Touch All-in-One Computer
50-inch Android touch all-in-one computer with configurable computing boards, connectivity and application software. The specification lists a 1920 × 1080 display. The same product range also lists a 55-inch version.
Enquire about this product50-inch Android Touch All-in-One Computer
50-inch Android touch all-in-one computer with configurable computing boards, connectivity and application software. The specification lists a 1920 × 1080 display. The same product range also lists a 55-inch version.
Select the computing configuration
Board options in the series include A33, A64, RK3188, RK3288, RK3566 and RK3399. CPU and GPU capabilities depend on the board. Android versions from 4.4 to 13 are listed across the series; confirm the supplied version and application compatibility for the selected model.
Connectivity and installation
The series lists speakers, Wi-Fi, Bluetooth, SD-card support and USB connectivity. Display-output connectors, port quantities, power supply and installation accessories depend on the selected configuration. Confirm your interface and mounting requirements before ordering.
Tempered glass, protective film, power-supply and screw options are listed. Confirm the package contents and required regional power-supply certification for your order.
Documents and engineering files
Office and WPS documents, Excel spreadsheets, Word documents, PowerPoint presentations, PDF files and JPG images require compatible installed applications. CAD, Pro/E and SolidWorks drawings, as well as 3D animations, require suitable Android viewing software or file conversion. Check the required file formats, file sizes and model complexity with your application software.
Media playback
Listed container formats include AVI, RM, RMVB, MKV, WMV, MOV, MP4, DAT/VCD, VOB/DVD, PMP, MPEG/MPG, FLV, ASF, TS, TP and 3GP. The codec list includes H.264, H.263, DivX, Xvid and MPEG. Actual playback depends on the board, Android build, player software, codec, resolution and bitrate.

50-inch Android computer specifications
| Display size | 50 inches; The same product range also lists a 55-inch version. |
|---|---|
| Board options | A33, A64, RK3188, RK3288, RK3566 and RK3399; CPU and GPU depend on the selected board. |
| Android versions | Android 4.4–13 options across the series; confirm the supplied version. |
| Display resolution | 1920 × 1080 as listed for this model; confirm the ordered screen. |
| Connectivity | Speakers, Wi-Fi, Bluetooth, SD and USB are listed; port types and quantities depend on configuration. |
| Installation accessories | Tempered glass, protective film, power supply and screws are listed; confirm the included items and regional certification. |
| Document and image formats | Office/WPS, Excel, Word, PowerPoint, PDF and JPG, with compatible applications. |
| Engineering files | CAD, Pro/E and SolidWorks drawings require suitable viewing software or conversion. |
| 3D content | 3D animations require compatible software and suitable hardware. |
| Media containers | AVI, RM, RMVB, MKV, WMV, MOV, MP4, DAT/VCD, VOB/DVD, PMP, MPEG/MPG, FLV, ASF, TS, TP and 3GP. |
| Video codecs | H.264, H.263, DivX, Xvid and MPEG; actual playback depends on hardware and player software. |
Confirm the exact configuration, software requirements, accessories and power supply for your project before ordering.
No file is currently published for this product. Email zy@erpsz.net with the product model to request documentation.
10-inch Android Touch All-in-One Computer
13.3-inch Android Touch All-in-One Computer
14-inch Android Touch All-in-One Computer
15-inch Android Touch All-in-One Computer