Browse product categories

Y100 10.1-inch Rugged Android Tablet
Y100 rugged Android tablet with a 10.1-inch touch display, Android 13, an octa-core 2.2 GHz processor, 6 GB RAM, 128 GB storage and optional data-capture modules.
Enquire about this productY100 10.1-inch Rugged Android Tablet
The Y100 combines a 10.1-inch touch display with Android 13 and an octa-core 2.2 GHz processor. The standard configuration has 6 GB of RAM and 128 GB of storage.
Touch operation for field work
The HD display supports multi-touch, glove operation, touch operation in wet conditions and signatures using a passive stylus. Confirm the required accessories and operating conditions for your application.
Rugged enclosure and battery
The enclosure uses high-strength industrial materials. The product specification describes a 1 m drop-test requirement. A built-in 10,000 mAh battery supports mobile work; actual operating time depends on the workload, display settings, wireless connections and optional modules.
Optional data-capture modules
Available options include a barcode scanner, NFC, UHF RFID, an ID-card decoding module and a fingerprint module. Module availability and compatibility depend on the selected configuration.
Contact us to confirm the required modules, accessories and environmental protection rating for the exact model before ordering.
Front-facing NFC option
The NFC module operates at 13.56 MHz and supports ISO 14443 A/B, ISO 15693, NFC-IP1 and NFC-IP2 protocols. Access, attendance, transit and membership card applications depend on the selected card, module and application software.

Application integration
The tablet can be evaluated for inventory counting, warehousing, vehicle management, livestock management, healthcare and industrial data collection. Required software, accessories and data interfaces depend on the project.
Y100 specifications
| Model | Y100 |
|---|---|
| Display | 10.1-inch HD touch display |
| Processor | Octa-core, 2.2 GHz |
| Operating system | Android 13 |
| Standard memory | 6 GB RAM |
| Standard storage | 128 GB |
| Touch functions | Multi-touch, glove operation, wet-condition touch operation and passive-stylus signatures |
| Battery | Built-in 10,000 mAh battery |
| Optional modules | Barcode scanner, NFC, UHF RFID, ID-card decoding and fingerprint modules; confirm availability and compatibility |
| Enclosure | High-strength industrial materials; the product specification describes a 1 m drop-test requirement |
Confirm the exact environmental protection rating, supplied accessories and optional modules for the selected configuration before ordering.
No file is currently published for this product. Email zy@erpsz.net with the product model to request documentation.
