Solutions

Digital Healthcare Solutions

Smart hospital planning

Positioning

A digital hospital combines clinical care, patient service and operational management. Electronic medical records, an integration platform and shared data services support connected clinical processes, online patient journeys and more detailed operations management. For China projects, scope may include EMR, smart-service, smart-management and interoperability maturity assessments, with target levels selected for the hospital.

Core functions

Clinical systems

The scope can cover HIS, structured EMR templates and quality control, LIS, PACS and imaging, RIS, surgery/anaesthesia, intensive care, nursing, transfusion, pharmacy and infection control. Clinical decision-support integration may address medication review, critical results, care pathways, VTE/sepsis risk alerts and guideline knowledge. Potential AI integrations include imaging and pathology assistance, ECG analysis, documentation and quality checks, and voice input. Clinical functions require appropriate validation and professional oversight. Telemedicine may connect consultations, imaging, ECG, ultrasound, care networks and pre-hospital emergency services.

Patient services

Online journeys can include timed appointments, navigation and preliminary intake, payments, examination booking and results, admissions and deposits, discharge settlement and invoices, and appropriate follow-up and medicine-delivery services. On-site support includes indoor wayfinding, queues and reminders, service robots, accessibility and older-person-friendly design. Feedback, complaints, health education, chronic-disease follow-up and authorised wearable-data integration can be included.

Hospital operations

  • DRG/DIP-related reimbursement management for applicable China projects, costing, performance, budgets, assets, equipment utilisation and management dashboards.

  • Medical-consumable logistics (SPD), linen and instrument traceability, energy and building controls, security and fire systems, cold-chain/vaccine temperature monitoring, lifts and parking.

  • De-identified research data services, biobanks, clinical-trial management, teaching and simulation.

Integration and data

An ESB/message bus, master data for patients, departments, medicines and services, interface standards and governance connect systems. Clinical and operational data repositories (CDR/ODR), dictionary mapping, quality checks and an enterprise master patient index (EMPI) support consistent data. Unified identity can provide clinician single sign-on, mobile workspaces and patient accounts.

Technical approach

Private or hybrid cloud, active-active data centres, segmented networks and disaster recovery support relational, time-series and object storage, warehouses and data lakes. Integration, CDR/ODR, AI, low-code and IoT platforms serve clinical, patient and management applications. Terminals include workstations, nursing PDAs, self-service kiosks, dashboards and patient apps.

  • Review HL7 FHIR, applicable CDR specifications, DICOM and relevant health-information standards, including WS/T for China deployments. The supplied planning examples include China interoperability Level 4 Grade A and approximately EMR Level 5; select actual targets for the hospital rather than treating them as existing certification.

  • Use active-active or standby arrangements for critical systems. The reference continuity objectives are minute-scale RPO and hour-scale RTO, to be agreed and tested. Provide network-loss procedures and rehearse offline or paper emergency workflows.

  • Protect sensitive health data through authorised access, de-identification, auditing and controls on transfers. China projects should review MLPS Level 3 and applicable personal-information, data-security and healthcare-network requirements.

  • Integrate existing systems rather than replacing everything at once. Maintain interface inventories and version control.

Implementation

Assess current systems and gaps against chosen targets. Phase the master plan, beginning with the platform and core clinical workflows before AI and research. Standardise dictionaries and patient identity, clean and migrate historical data, and use parallel running where appropriate. Pilot with clinical teams, expand across the hospital, complete the agreed assessments and acceptance, and continue data-quality and model monitoring with user feedback.

Intended benefits

The objectives are shorter stays and waits, improved record quality and medication safety, lower consumable and energy costs, and better patient satisfaction. Results depend on clinical workflow design, implementation and ongoing use.

← Back to Solutions