ZHIYUAN TECHNOLOGY

Document Encryption & Data Protection

Solutions

Document Encryption, Endpoint Management and Audit

Zhiyuan document-encryption management integrates encryption, endpoint controls and audit functions. The detailed modules below describe Tianrui GreenShield; separately purchased components are identified where applicable.

Solution overview

Encrypt documents without changing ordinary working habits. Platform options include 32-/64-bit Windows XP, Windows 2003/2008, Windows 7/8/10, Mac Office and Linux. Features include three-key management, application-server allowlists, workflow-based encryption/decryption approvals, automatic encrypted-file backups, multi-format document protection and configurable trusted programs, mobile reading of encrypted server files, and an integrated database for data management.

Application examples include Office, Photoshop, CorelDRAW, AutoCAD and UG. Foxmail/Outlook integration can automatically decrypt attachments to allowlisted recipients. Protection includes source-code files and large-file encryption.

The overview groups functions into transparent encryption/decryption, three-key management, offline policies, online/mobile decryption requests, outbound-file controls, groups, server/email allowlists; preventive and in-use controls for desktops, browsing, email, chat, devices, printers, shares, USB storage and applications; and after-the-event evidence through logs, browsing/chat records, screen recordings, email/print records, traffic and USB-transfer logs.

1. Data-leakage prevention module

AreaFunctions described in the original
Server platformsStandard: Windows Server 2003/2008/2012, 32-/64-bit. Compatibility list: Windows 7/8/10, 32-/64-bit.
Client platformsStandard: Windows XP/7/8/10, 32-/64-bit. Compatibility list: Windows Server 2003/2008/2012, 32-/64-bit, and Linux.
Antivirus compatibilityStandalone/network antivirus products listed for server and client environments include McAfee, Kaspersky, NOD32, Symantec/Norton/SEP, Trend Micro, Rising, Jiangmin and 360.
Console administratorChange the console login password.
Endpoint administrationUpgrade/uninstall GreenShield clients, inspect details and installation status, configure functional modules and synchronize endpoint nicknames with computer names.
Admission and logsWhen new-user admission requires approval, console staff decide whether to admit the endpoint. Log endpoint access and disable selected modules for particular users.
Endpoint settingsConfigure idle-state changes when keyboard/mouse input stops, endpoint-icon/process visibility, operational logging and visibility of the authorization-code menu. These are descriptions of product options, not changes made to this website or computer.
System optionsServer, console, endpoint and new-user-authentication parameters. Hotkeys for importing offline policies, maintenance, showing/hiding icons and screenshots. Additional administrators and delegated rights; console-operation audit queries by time, operator, type and result; product registration and registration details.
Policy/rule centreDefine operator types, permissions and classification levels; controlled-program policies, security options and outbound limits. Options include encryption type, clipboard, short-term offline operation, screenshots and endpoint icons. Copy/import/export policies. Configure controlled programs separately for Windows, Mac and Linux.
Enterprise keyMaster, enterprise and file keys participate in encryption and all three are verified for decryption. Customers set and can change the enterprise key, including after an employee with key knowledge leaves. The customer-controlled enterprise key is not held by the developer.
Transparent encryptionDriver-level dynamic encryption protects confidential files from creation. Authorized users open and save normally while the background driver decrypts on opening and encrypts on saving.
Semi-transparent modeLocally created files are not automatically encrypted, but internal encrypted files can be opened and remain encrypted when edited and saved.
Copy/paste and screenshotsPrevent copying encrypted content to uncontrolled applications. Block capture tools and Print Screen, or return black images, while optionally allowing specified capture tools. The bundled capture tool allows captured images to be pasted only into encrypted documents.
OLE, virtual printing and programsBlock OLE insertion; encrypt files produced by virtual printing; prevent controlled-program renaming or process impersonation and terminate detected impersonators. Endpoint process protection includes hiding the process in Task Manager.
Screen watermarkCustom text, font size, colour and transparency.
Reading permissionsFive classification levels for personnel/documents; lower-clearance users cannot open higher-classified files. Department-based reading isolation prevents unauthorized cross-department access.
Bulk and requested decryptionHighly privileged users can bulk-decrypt files for external release without approval. Ordinary endpoints request release from an online approver.
Controlled outbound filesRequest packages with limits on opening count, lifetime, password verification, editing, screenshots and printing, including expiry/self-destruction options. Files cannot open outside the configured limits.
Outbound allowlist and recordsAllowlist trusted external computers by machine code so packages can open without entering an authorization code. Record outbound activity and destinations.
Short-term offline useConfigure an unapproved short offline period, for example 72 hours, during which encrypted files remain usable and saved files remain encrypted.
Long-term/permanent offline useRequest longer travel authorization before departure; files become unavailable after authorization expires. Permanent offline authorization is described for branches/offices so encrypted documents can be exchanged with headquarters. Log offline requests for audit.
Approval workflowsDefine and assign workflows for offline access, decryption, printing for external release and direct outbound release; retain approval logs.
Special directoriesAutomatically decrypt files when configured characters occur in a filename or directory.
Encryption/decryption recordsLog operator, time, operation type, total files, successes and failures.
Classification changesAuthorized users can change document classifications only to levels below their own. Administrators can query change logs.
File backupChoose file types for automatic backup after creation/editing and upload copies to the server to mitigate accidental or malicious deletion. Backup records include endpoint, operator, time, size in KB, filename and original path.
Server-policy backupManual policy-configuration backups and scheduled backups with configurable retention days and storage paths.
Email allowlistFor trusted recurring recipients, automatically decrypt encrypted attachments to plaintext without an approval request.
Server allowlistIntegrate with application servers to configure encryption/decryption on upload/download over HTTP/HTTPS.
Mac endpointsOnline endpoints communicate continuously with the server and support policies, bulk encryption/decryption and short-term offline rules. Permanently offline endpoints operate without server communication. Mac-kernel transparent encryption applies to configured document types in trusted processes; untrusted processes cannot operate on encrypted documents. Encryption preserves file formats and sizes and supports exchange with Windows-encrypted files. Selected file types back up automatically after creation/editing. Modes include transparent encryption/decryption and decrypt-only operation.
Linux endpointsManage permanently offline endpoints by adding/editing/deleting endpoint details and importing policies. Online endpoints support policy delivery, clipboard controls and short-term offline use. Linux-kernel transparent encryption protects configured documents used by trusted processes, preserves file formats and sizes, and supports Windows compatibility. Transparent and decrypt-only modes, copy/paste/screenshot controls between controlled and uncontrolled applications, and online upgrade/uninstallation are included.
Secure application access — separate purchaseA GreenShield application-server access component placed between core servers and users permits access only from endpoints with the encryption client. Combined with transparent encryption and server allowlists, it decrypts uploads and encrypts downloads.
Authorized decryption key — separate purchaseAllows designated people who do not install the endpoint program to view encrypted documents.

2. Desktop-management system

AreaFunctions described
Web/network accessRestrict browsing with categorized URL libraries; restrict network ports; configure traffic limits. A configured network boundary can trigger a warning, disconnect the out-of-range connection or lock the screen. Define LAN ranges so port controls can distinguish local traffic and optionally exclude LAN traffic from statistics.
PrintingPrinter permissions and custom print watermarks: content, font size/colour/type, position and layer.
Chat controlsQQ allowlists permit all, no, or specified QQ accounts. Restrict QQ file transfers by size or prohibit them.
USB authenticationRegister and authenticate USB storage devices so only approved devices can be used.
AssetsQuery endpoint hardware and installed software; log hardware/software changes.
Hardware/device controlsAllow, prohibit or make USB storage read-only. Control optical/floppy drives, serial/parallel ports, USB keyboards/mice, network cards and other interfaces. Inspect devices and enable/disable drivers.
Task delivery — separate purchasePush file tasks so endpoints retrieve designated files from an FTP server; distribute software with optional automatic installation. Log uploads, task operations and distribution, query by time, and search file uploads by filename or username or send a specified file.
Endpoint informationInspect operating system, startup time, logged-in user and disk utilization.
Applications and processesRestrict applications or window titles. Inspect running processes and terminate suspicious ones.
File explorerBrowse target-endpoint disks, files and folders for administration.
Software managementInspect installed software and distribution; create uninstall tasks for unauthorized or unsafe software; retain uninstall, operation and distribution records.
System servicesManage services, failure-recovery/restart actions and enable/disable settings for hardware profiles.
SharesApply sharing policies and inspect share names, paths and user counts.
Remote assistanceRemote Windows logoff, restart, shutdown and messages.
IP/MAC bindingBlock network access after a bound IP is changed; MAC binding is intended to restrict unauthorized network-card changes or external computers.
ARP protectionBind endpoint ARP information using IP and MAC addresses to help prevent ARP spoofing.

3. Behavioural auditing

RecordDetails described
File operationsRecord endpoint file-operation types and query by time period.
Window titlesSearch window events by time or matching characters.
USB outbound copiesQuery by time or filename, including source and destination paths.
Application useRuntime, username, event title and event content, including errors, warnings and normal use.
Disc burningBurn time, endpoint, file size, recorder and disc names.
PrintingDetailed print-operation records.
Screen tracking/recordingLive endpoint-screen viewing and periodic captures saved to the server for later review.
BrowsingBrowse time, website address, page title and URL, searchable by period; open the recorded URL for review.
Forum postsPost time, title and URL, searchable by period, with access to the recorded post.
TrafficCurrent endpoint network traffic for resource-use analysis.
Chat contentChat audit options include QQ/TM, MSN/Live Messenger, Skype, Yahoo Messenger, Alibaba TradeManager, AOL, Google Talk, Sina UC, E-Hua-Tong, ICQ, Taobao Wangwang, Fetion, UUCALL, IP Messenger and FeiQ.
QQ file transfersSenders, recipients and transfer times.
Client and web emailRecord email sent through Foxmail/Outlook and webmail, including correspondents, subjects and attachments for audit queries.
AlertsConfigurable alerts for prohibited programs, removable-disk insertion/removal, IP/MAC changes, computer-name changes and IP/MAC-binding violations. Administrators enable or disable the applicable rules.
StatisticsReports on programs, browsing, chat and network traffic.