Factory Smart Terminals in the New Energy Industry

Factory smart terminals are becoming the key node in new energy manufacturing workshops that replaces paper work instructions and connects equipment with people. They gather electronic work instructions, workstation terminals, and static monitoring, which were previously scattered, into one screen and one system, giving operations in the cell, module, and PACK sections a unified entry point.

1. Core concepts and technical definitions

A factory smart terminal refers to an industrial-grade display terminal deployed at the production workstation side with interaction and networking capabilities. It usually carries three types of capability: first, display and version management of electronic work instructions (ESOP); second, workstation-level data collection and error-proofing; third, connection with systems such as ESD static monitoring, MES, and WMS. In the new energy industry, scenarios such as lithium batteries, photovoltaics, and energy storage PACK have high requirements for cleanliness, static protection, and process parameter traceability, so the smart terminal is not just a dashboard but a checkpoint for operational compliance.

2. System architecture and key functions

Architecturally, such systems generally have three layers. The terminal layer covers workstation screens, barcode scanners, wrist strap monitoring modules, torque guns, and other peripherals; the edge layer handles protocol conversion and local caching, so work instructions can still be retrieved when the network is down; the platform layer handles version distribution, permission management, and data retention.

Key functions concentrate in several areas. ESOP switches automatically by work order, so paper documents no longer need manual replacement during changeovers and the version error rate drops sharply. Static monitoring reads the grounding status of wrist straps, table mats, and equipment in real time, alarming immediately and locking the terminal screen when limits are exceeded. Workstation error-proofing verifies material batches and cell barcodes by scanning, blocking wrong materials directly. Data traceability binds operator, time, parameters, and results together, meeting the audit requirements of the new energy industry for batch consistency.

3. Typical manufacturing application scenarios

Suppose a plant making energy storage PACK has dozens of workstations in the module assembly section, each involving different cell matching and tightening torque. In the past, changeovers relied on the team leader distributing paper SOPs, and with many versions it was easy to pick the wrong one. After deploying smart terminals, scanning the work order triggers the corresponding ESOP, torque gun data is fed back automatically, and the terminal prompts and records when a wrist strap is not worn. In feedback from more than 120 customers covering 15+ industries, changeover preparation time is the improvement point mentioned most often in such scenarios.

Consider an electronics plant running a plug-in line for photovoltaic inverter mainboards, where insertion direction and polarity depend on visual inspection. The smart terminal enlarges the component polarity diagram on the workstation screen and combines it with scan confirmation, reducing reversed insertion. The ESD monitoring integrated in the terminal also performs online monitoring of workstation mats and wrist straps, replacing the previous practice of manual inspection records at the start of each shift.

Another hypothetical scenario is the BMS control board test workstation of an auto parts company. There are many test programs and mixed parameter versions; the smart terminal calls the corresponding test program by product barcode and uploads results directly, avoiding misjudgment caused by an operator selecting the wrong program. Deployment experience with more than 3,200 terminals shows that a unified entry point at the workstation side is easier to maintain than scattered stand-alone devices.

4. Selection points and deployment recommendations

Start with interface capability. Equipment brands on new energy lines are diverse, and the terminal must connect to mainstream PLCs, torque controllers, and static testers; whether the protocol library is open matters more than screen size. Next look at offline resumption: the line cannot stop when the workshop network fluctuates. Third, look at the ESOP version management logic, whether it supports distribution by work order, by machine, and by personnel permission rather than simple folder replacement. Fourth, look at the response speed of static monitoring: the delay from a wrist strap anomaly to a terminal alarm must be kept within an acceptable range.

For deployment, a step-by-step approach is recommended. Pilot at one workstation with frequent changeovers, get ESOP automatic switching and static monitoring linkage working, then replicate horizontally. Let operators participate in confirming terminal mounting height, scanner position, and alarm prompting, otherwise the equipment easily becomes decoration. In addition, digitizing work instructions is not moving PDFs onto a screen: steps must be re-divided and error-proofing logic embedded, and this workload is often underestimated.

5. Trend outlook and summary

The first direction is combining terminals with AI vision, for example giving real-time results on the workstation screen for insertion polarity and weld seam appearance. The second direction is static monitoring moving from workstation level to line-level linkage: once ESD at one workstation is abnormal, upstream feeding or downstream testing pauses in sync. The third direction is the terminal as a data entry point, aggregating cycle time, abnormal stoppages, and quality interceptions into line health indicators for process and IE analysis.

The value of factory smart terminals in the new energy industry lies not in the screen itself but in fixing actions such as work instruction, error-proofing, static protection, and traceability at the workstation side, so that compliance does not depend on human memory. For manufacturing scenarios such as cells, modules, PACK, photovoltaics, and energy storage that are sensitive to consistency and static, it is an unavoidable part of production line digitalization.