Factory smart terminals are becoming the key entry point for digital upgrading of new energy manufacturing lines. They concentrate work instruction, workstation interaction, static protection, and equipment linkage on one industrial-grade screen, giving scenarios such as lithium batteries, photovoltaics, and energy storage, which have extremely high requirements for cleanliness and static protection, a unified on-site data node for the first time.
1. Core concepts and technical definitions
A factory smart terminal, simply put, is an industrial all-in-one PC or touch terminal installed at a production workstation. It replaces traditional paper SOPs and scattered dashboards, integrating ESOP electronic work instructions, workstation calls, andon response, and ESD static monitoring data into one interface. In the new energy industry, such terminals usually need to meet several hard requirements: fanless cooling to suit dusty environments, IP65 or higher protection, connection to MES and WMS systems, and compatibility with real-time data return from ESD devices such as ion fans, anti-static wrist straps, and grounding monitors.
Unlike ordinary commercial tablets, factory smart terminals emphasize 7x24 stable operation, wide operating temperature range, and physical interface compatibility with PLCs, sensors, and barcode scanners. Mainstream industry solutions generally reserve RS485, Ethernet, and DI/DO interfaces to facilitate later line expansion.
2. System architecture and key functions
A complete factory smart terminal solution usually has three layers. The bottom is the device layer, including execution and sensing units such as static monitors, ion fans, torque screwdrivers, and barcode readers. The middle is the terminal layer, the smart terminal itself at the workstation, responsible for local display, logic judgment, and abnormal alarms. The top is the system layer, aggregating data to the plant MES or ESOP server through MQTT or OPC UA protocols.
On key functions, several points deserve particular attention. ESOP electronic work instructions can switch versions automatically by work order, so paper documents do not need manual replacement during a line change, reducing wrong and missing assembly. ESD static monitoring displays wrist strap grounding resistance, table surface static voltage, and ion fan balance in real time, and the terminal pops up and locks the workstation once limits are exceeded. There is also workstation poka-yoke, such as screw counting, material scan verification, and torque data binding, all completed through the terminal working with screwdrivers and barcode scanners. Suppose a lithium battery module plant has dozens of workstations on the PACK line; equipping each workstation with one smart terminal connects cell scanning, polarity verification, screw torque, and static protection end to end.
3. Typical manufacturing application scenarios
In the new energy industry, there are three scenarios where factory smart terminals are used relatively often.
The first is the lithium battery cell assembly workshop. This step is particularly sensitive to static and metal foreign objects. Suppose a lithium battery company deploys smart terminals at stacking or winding workstations: the terminal displays the ESOP work instructions while collecting static wrist strap and table surface static data in real time. If the operator's wrist strap falls off or grounding resistance exceeds the limit, the terminal immediately gives audible and visual alarms and uploads the abnormal record to MES, so that this cell can later be traced and isolated.
The second is the photovoltaic module welding and lamination workstation. Photovoltaic lines run at a fast takt with frequent model changes. The smart terminal can automatically retrieve the corresponding welding temperature curve, lamination time, and EL inspection standard by work order. Suppose a photovoltaic module plant installs terminals beside the string welding machines: operators no longer flip through paper process cards, and the terminal directly displays the welding parameters for the current format and verifies them against the welder PLC, prohibiting startup if parameters are wrong.
The third is the energy storage PACK line. Energy storage battery packs are large and high-voltage, and the assembly process has strict torque and insulation requirements. Suppose an energy storage system integrator uses smart terminals at PACK assembly workstations to bind the torque data of every screw and monitor the readings of the insulation tester at the same time. All data is archived automatically, forming a digital file for each battery pack. If after-sales problems appear later, it can be traced directly to the specific workstation and operating time.
4. Selection points and deployment recommendations
When choosing a factory smart terminal, do not look only at screen resolution. New energy workshops often have dust, vibration, and temperature and humidity changes, so the terminal is best chosen with a fanless fully enclosed structure, protection of at least IP54, and IP65 recommended for lithium battery workshops. On interfaces, confirm whether RS485 and DI/DO are supported, because many static monitors and ion fans still use serial communication. On system compatibility, ask clearly whether it can connect to the plant's existing MES, ESOP, and WMS, and whether it supports common protocols such as MQTT, Modbus TCP, and OPC UA.
For deployment, it is advisable to pilot on one line or in one workshop first. Do not roll out plant-wide from the start. Get the two basic functions of ESOP display and ESD monitoring working first, then gradually add poka-yoke and torque collection. On networking, if the workshop Wi-Fi is unstable, consider wired Ethernet with PoE power to reduce extra cabling. In addition, the terminal mounting height must match the operator's line of sight and working habits; generally a screen center 1.4 to 1.6 meters above the floor is appropriate.
5. Trend outlook and summary
The next step for factory smart terminals in the new energy industry will go in two directions. One is stronger edge computing capability, where the terminal itself can perform simple visual judgment and logic operations, without sending all data back to the server. The other is combining with AI, for example using the terminal camera to identify whether operator actions are compliant, or using historical data to predict static risk.
For new energy manufacturers, a smart terminal is not just a display device but the smallest unit of workstation digitalization. Concentrating ESOP, ESD monitoring, and workstation poka-yoke in one terminal both reduces the number of on-site devices and makes data structured at the source. The industry currently has more than 3,200 terminals running cumulatively, serving more than 120 customers and covering 15+ industries, which shows this path has been validated. Choose the right terminal and deploy protocols and networks well, and the digital foundation of the new energy line is solid.