An electronic label update should be checked against both the approved information and the physical location where it appears. Sending an update is only one part of the workflow; the team also needs an agreed way to determine whether the intended information is available at the correct shelf.
Start with identification. Record the location identifier and the label or display identifier. If the content refers to an item, use its approved identifier and description. Keep the physical mapping available to the people responsible for preparing and checking updates.
Define the intended content. Specify the required fields, units, language and layout for the actual use case. Review text that could be confused with another location or product. Use approved business data rather than manually copying a value from an unrelated label.
Agree on the evidence of an update. If the selected configuration provides an acknowledgement or status record, document what that record means. Distinguish submission of an update from confirmation of the displayed result. Review representative displays at their actual locations as part of acceptance.
Define the exception workflow. Identify the response to an incorrect assignment, an unavailable label or information that does not match the approved update. Record the location, label identifier, expected content, observed content and time. Escalate through the agreed support process instead of repeatedly submitting unreviewed changes.
Retain a controlled change reference for updates that affect the operating process. After replacement or reassignment, check both the mapping and displayed information again. The available communication, acknowledgement and update functions must be confirmed for the selected equipment and project configuration.
For information about this topic, please contact our team.
← Back to Electronic Tags and Smart Shelves
