Products

24 inch Android touch all-in-one machine

10 inch Android touch all-in-one machine There are A33, A64, RK3188, RK3288, RK3566, RK3399 motherboards available. We are waiting for hundreds of options and recommend different motherboards, CPUs, and GPUs according to your needs. The resolution is 1920X1080 HD, ultra-thin, green, a

特征 规格 下载

10 inch Android touch all-in-one machine

There are A33, A64, RK3188, RK3288, RK3566, RK3399 motherboards available. We are waiting for hundreds of options and recommend different motherboards, CPUs, and GPUs according to your needs. The resolution is 1920X1080 HD, ultra-thin, green, and energy-saving

The Android touchscreen integrated device comes with a variety of interfaces, including speakers, WiFi, Bluetooth, SD, HDI, USB, and more. It comes with tempered glass, protective film, certified dual power supply, screws, and more

Static formats include: Office, WPS, Excel, etc Word PowerPoint PDF JPG

Drawing classes: CAD, PROE, Solidworks

3D formats include: 3D 3D animation

Dynamic formats include: AVI (H.264, DIVX, DIVX, XVID), rm, rmvb, MKV (H.264, DIVX, DIVX, XVID), WMV, MOV, MP4 (. H.264, MPEG, DIVX, XVID), DAT (VCD format), VOB (DVD format), PMP, MPEG, etc 30 formats including MPG, FLV (H.263, H.264), ASF, TS, TP, 3GP, MPG, etc.










24 inch Android touch all-in-one machine


There are A33, A64, RK3188, RK3288, RK3566, RK3399 motherboards available. We are waiting for hundreds of options and recommend different motherboards, CPUs, and GPUs according to your needs. The resolution is 1920X1080 HD, ultra-thin, green, and energy-saving

The Android touchscreen integrated device comes with a variety of interfaces, including speakers, WiFi, Bluetooth, SD, HDI, USB, and more. It comes with tempered glass, protective film, certified dual power supply, screws, and more

Static formats include: Office, WPS, Excel, etc Word PowerPoint PDF JPG

Drawing classes: CAD, PROE, Solidworks

3D formats include: 3D 3D animation

Dynamic formats include: AVI (H.264, DIVX, DIVX, XVID), rm, rmvb, MKV (H.264, DIVX, DIVX, XVID), WMV, MOV, MP4 (. H.264, MPEG, DIVX, XVID), DAT (VCD format), VOB (DVD format), PMP, MPEG, etc 30 formats including MPG, FLV (H.263, H.264), ASF, TS, TP, 3GP, MPG, etc.


推荐产品