PRODUCTS

Products

Browse product categories
19-inch Windows Touch All-in-One PC

19-inch Windows Touch All-in-One PC

19-inch Windows touch all-in-one PC, MES tablet, windows esop, windows sop, windows electronic work instructions

Enquire about this product

19-inch Windows touch all-in-one PC MES tablet sopwindows sopesop  windows sop  windows electronic work instructions

10.4-inch Windows touch all-in-one PC MES tablet windows esop  windows sop  windows electronic work instructions

illustration
illustration
illustration
illustration
illustration
illustration
illustration
illustration
illustration
illustration
illustration

 
System CPU Intel® Celeron J1900 quad-core 1.99G
Memory 4GB
Solid-state drive 64GB
Operating system Windows 10 64-bit (64-bit requires 64GB or more storage)
Display LED screen 10.4" LED screen
Resolution 1366*768 , 21.5-inch is 1920*1080
Contrast ratio 800:1 (Typ.) (transmissive) 
Brightness 250 cd/m² (Typ.)
Viewing angle 70/85/70/80 (Typ.)(CR≥10
Bare unit dimensions 465*288*44mm
Net weight 4.15kg
Screen ratio 16:9 / display area: 408x229mm
Network WiFi Yes
Ethernet Supported
Bluetooth BlueTooth4.0
Interfaces Mini USB USB OTG (1037U: 2.0*4) (J1900: 2.0*2 / 3.0*2)
RJ-45 Ethernet port 1
Power jack DC 12V power input
Audio Stereo HD
COM port RS232
Other interfaces PS&2 LPT&1 VGA&1*COM
Expansion slot 1 * MINI PCI-E slot, supports PCIe 3G and WIFI signal
Media playback Video formats MPEG-1,MPEG-2,MPEG-4,H.263,H.264,VC1,RV etc. Support up to 1080p
Audio formats MP3/WMA/AAC etc.
Image formats JPEG,JPG
Other functions Wireless mouse Supported
Wireless keyboard Supported
Speakers 2*3W
OSD languages OSD operation in Chinese, English and other languages
Special functions Supports ACPI S3 power saving mode
Supports CPU smart fan
Supports watchdog technology
Accessories Adapter Power adapter 12V/5A
Wall-mount metal bracket Optional

Frequently asked questions

What is 19-inch Windows Touch All-in-One PC?

19-inch Windows Touch All-in-One PC: 19-inch Windows touch all-in-one PC, MES tablet, windows esop, windows sop, windows electronic work instructions

Who provides 19-inch Windows Touch All-in-One PC?

Kechuang Zhiyuan Technology provides it. Founded in 1993, the company covers industrial hardware manufacturing, digital factory systems and smart city integration.

Which industries use it?

Manufacturing, automotive, electronics, food and beverage, logistics and public infrastructure projects.

How do I get specifications or a quotation?

Email zy@erpsz.net with your application, volume and delivery location. The team replies with specifications, lead time and pricing.