Knowledge Center
Contents

Detailed Architecture of the Online Quiz Functionality and Module Interactions

Many factories mistakenly believe that an online quiz system simply adds an exam link to training, where employees click a button to submit their answers and the process ends. The core issue is that the quiz and actual job assignment remain disconnected; after taking the exam, the system does not determine which work instruction to view or which workstation to operate at. A true online quiz system must be embedded within the operational workflow, tightly integrated with personnel permissions, job assignments, and skill records.

1. Login and Identity Verification: Confirming the User Before the Quiz
The first checkpoint for an online quiz is not the questions themselves, but verifying who is answering. The value of face recognition for access control lies in preventing proxy attendance or operation; individuals without authorized facial permissions cannot even open the terminal interface. Suppose a hypothetical electronics factory has an employee attempting to take a test on behalf of a colleague; facial comparison would immediately reveal this discrepancy. The key configuration point is to bind facial permissions to specific workstations in advance, rather than adding this linkage after the system goes live.

2. Job Roles and Permissions: Questions Follow the Workstation
Permission management operates at both field and group levels, allocating file access rights by production line and workstation, and controlling page-level permissions to restrict users to viewing only designated pages. Job management assigns specific work content to each workstation, ensuring employees can only view the SOP relevant to their current post. The online quiz module hangs on this logic: when an employee changes posts, the system automatically switches the corresponding work instruction, and the quiz content updates accordingly. This applies to scenarios involving multi-skilled worker development, where employees handling multiple posts do not need to manually locate test papers; the system pushes questions based on the current job role.

3. Skill Matrix and Employee Profiles: Where Quiz Results Are Recorded
Quiz results are not discarded after the exam. The skill matrix visualizes employee training records, proficient processes, exam scores, and certification status to assist in scheduling. Employee profiles contain employee ID, name, job role, skills, and photos, supporting batch import and training history queries. Online quiz scores are directly recorded into these profiles; when team leaders schedule shifts, they can consult the matrix to identify which employees are qualified for specific processes. The critical configuration requirement is to ensure questions correspond accurately to specific processes, avoiding mismatches between what is tested and what is performed.

4. Multi-Device Collaboration: Device-Agnostic Quizzing
Employees take quizzes on terminal all-in-one machines, while the management end views results in real time. Consider the following scenario: suppose a hypothetical SMT production line undergoes a changeover. An estimated reduction in changeover duration can be achieved if employees complete online quizzes for new posts on the terminal; the system unlocks SOP viewing permissions for that workstation only upon passing the quiz, while failing candidates continue to view the training page. This linkage relies on the integration of three modules: permissions, job roles, and the quiz function. Purchasing a standalone quiz tool cannot achieve this level of coordination.

Final Recommendation: Clarify job roles and permissions before configuring how questions are assigned. If the foundational structure is not clear, even a large question bank will be ineffective.

Topic: ESOP FAQ